For the past year, the City has been working with Toole Design Group on a citywide Transportation Plan. After months of public data collecting, Toole has released a draft of the find report for the Hyattsville Transportation Plan. 

You can find several documents attached to this forum: the Hyattsville Transportation Plan final report, Appendix A: Existing Conditions Memo, Appendix B: Future Condition Scenarios, Appendix C: Wayfinding Plan, and Appendix D: Planning Level Cost Estimates. 

Toole Design Group will be presenting the Hyattsville Transportation Plan at the October 1 City Council meeting. The report will come back to the City Council for adoption on November 5, 2018. Any comments you have on the report can be submitted on this page for the City Council to take into consideration when the plan comes up for adoption. Comments should be submitted by October 29, 2018 in order to be viewed by the City Council in advance of their November meeting. 

Although 30 people proposed or upvoted a sidewalk connector between the south end neighborhood and the civic center -- twice as many as the next most popular idea on the Transportation Plan forum, it was once again left out of the report being presented to the City Council.

It's not clear to me who reviews the Speak Up HVL forum feedback, or how it is decided whether to incorporate any of it in the next iteration of the proposal. I'm also unclear as to whether the proposed Transportation Plan abrogates other actions of the City Council.

In the case of the 42nd Ave. and Decatur St. sidewalk connector, it was proposed 10 years ago by the Neighborhood Design Center, and accepted by the City Council. The City dragged its feet on implementing it because, according to staff, the owners of the adjacent large parcel were planning to develop it for new residences, and at that time, would be required to install sidewalk at their expense. However, that redevelopment did not happen and the owners say they have no plans for it to happen in the future.

In 2007, the CIty developed a Sidewalk Policy and amended it in 2016 (see http://www.hyattsville.org/DocumentCenter/View/3790/Sidewalk-Policy?bidId= ). According to the policy, a sidewalk should be built on one side of these blocks (it meets all the criteria). Was the contractor who developed the draft Transportation Plan even aware of the policy, and if they were, how did it decide whether or not to implement it in the places where it would apply? As it happens, very few new sidewalks are proposed, which would seem to be a de facto repudiation of an important policy passed not once, but twice, by the City Council. At the very least, the City Council should make clear the relationship between this Plan, if adopted, and the existing Sidewalk Policy.

My neighbors and I strongly encourage the City Council to include the 42nd and Decatur sidewalk connector in the Transportation Plan in order to make a necessary improvement in the safety of pedestrians -- especially schoolchildren -- currently competing with motor vehicles on a narrow and low-visibility section of road in south Hyattsville.

11 Votes Created
Default_avatar
Cliff Mayo 8 months ago

Adding on to this, there are (useable) sidewalk concerns all over the city outside of the historic center and the slightly-less-dense West Hyattsville. E.g., Hamilton Street, Gallatin Street/40th Place, etc.

It seems that pedestrian safety could be prioritized more with strategic road dieting and addition of one-ways, even if it is at the expense of the usefulness of some of these roads for (mostly cut-through) traffic.

Vote